Frequently Asked Questions
Answers to common queries about lift installations, sizing details, and AMC coverage.
New Lift Installations
We require: number of landing levels, landing floor thickness, overhead
clearance (distance from top floor landing to shaft ceiling), pit depth, wall
load parameters (concrete vs brick), and preferred entry direction (telescopic
automatic doors, center-opening sliders, or manual gates).
Once the structural concrete shaft is certified, a typical residential lift
requires 4 to 6 weeks for mechanical assemblies, wiring, safety checks, and
handover. Heavy freight lifts or customized panoramic glass cabins require 6 to
8 weeks.
Maintenance & AMC Plans
Our Comprehensive AMC covers all monthly safety checks, priority emergency
breakdown visits, and the replacement cost of key components like microprocessor
control cards, relays, push buttons, rollers, door operators, and guide shoes.
Geared pulleys or structural cabin frames are subject to separate terms.
Both our labor-only and comprehensive AMC plans include unlimited breakdown
callouts. In the event of a fault, a technician is dispatched to resolve the
issue at no extra service charge.
Elevator Modernization
Modernization is highly cost-effective and takes far less time than a complete
replacement. If the guide rail alignment and cabin frames are structurally
sound, replacing the controller cabinet, wiring, and motor PM traction mechanism
can make the lift run like new at a fraction of the cost.
During modernization, the elevator must be taken out of service to ensure
technician safety. Depending on the components being replaced (e.g. controller
swap vs complete motor swap), downtime ranges from 3 to 7 working days. We
coordinate schedules to minimize disruption for residents.
Still Have Unanswered Questions?
Get in touch with our helpdesk. Our partners Ajay Panwar and Ajay Yadav are available to discuss technical specs.